What Can We Do For You?
630.288.3800
or contact us by email

facebook-30px.png Linkedin-30px.png Youtube-30px.png emcor_nation_30px.png

  • Home
  • About Us
  • Services
  • Case Studies
  • News
  • Contact
  • Careers

Shirley Ryan AbilityLab
CHICAGO, IL

Shirley_Ryan_AbilityLab.jpg

VALUE DELIVERED

Gibson Electric & Technology Solutions (Gibson) assisted in the construction of the Shirley Ryan AbilityLab, providing various electrical construction services for the three- year, 285,000-man-hour project.

The AbilityLab included new construction in administrative, parking, and visitor spaces, each designed for high-quality, centralized patient care. The Gibson team utilized a collaborative on-site approach that allowed complex electrical installations to be completed on a tight project schedule.

CLIENT OBJECTIVES

The Shirley Ryan AbilityLab was built to serve as replacement for the Rehabilitation Institute of Chicago. The new facility greatly increased the square footage of the rehabilitation hospital and incorporated state-of-the-art laboratory and therapy spaces.

PROJECT SOLUTIONS

During the project, Gibson integrated multiple low-voltage systems, including security, visitor management, asset tracking, and nurse call. The electrical and systems installation involved:

  • 1.8-million feet of conduit
  • 6.3-million feet of power cable
  • Over 20,000 lighting fixtures
  • Over 24,000 branch devices

CLIENT BACKGROUND

The Shirley Ryan AbilityLab, formerly the Chicago Rehabilitation Institute, has been rated as one of the finest rehabilitation facilities in the world for more than 25 years. This was the first project Gibson worked with the AbilityLab. Since its completion, Gibson has been awarded multiple off-site contracts with the AbilityLab, as well as on- going work at the main facility.

BIOTECH / HEALTHCARE
HOSPITALS

 

OPERATING COMPANY:
Gibson Electric & Technology Solutions
3100 Woodcreek Drive
Downers Grove, IL 60515-5427
630.288.3800
www.gibsonelec.com

CLIENT:
Shirley Ryan AbilityLab

GENERAL CONTRACTOR:
Power Construction

ARCHITECT:
HDR / Gensler

MECHANICAL ENGINEER:
Environmental Systems Design

PROJECT DURATION:
36 months

 

cs_value.gif

 

 

  case_box_check.gif Design/Build
  case_box.gif Bid Build
  case_box_check.gif New Construction
  case_box.gif Retrofit/Renovation
  case_box_check.gif Electrical Construction
  case_box.gif Mechanical Construction
  case_box.gif Facilities Services
  case_box.gif Consulting Services

Case Studies

  • Biotech/Healthcare
    • Friendship Village
    • Good Samaritan Hospital
    • Loyola University Medical Center Expansion and Upgrade
    • Palos Hospital Renovation
    • Rush University Medical Center Atrium Addition
    • Shirley Ryan AbilityLab
  • Commercial/Office Buildings
    • 111 South Wacker Drive
    • 155 North Wacker Drive
    • Confidential Data Storage Campus
    • Kirkland & Ellis
    • Mesirow Financial Headquarters
    • The Kitchens of Sara Lee
  • Entertainment/Hospitality
    • Hotel Arista CityGate Centre
  • Public Government
    • Bensenville Wastewater Treatment Plant Improvements
    • Connecting Tunnels and Gates, Thornton Composite Reservoir
    • Disinfection Facilities, Terrance J. O'Brien Water Reclamation Plant
    • Village of Arlington Heights Municipal Complex
  • Technology
    • Microsoft Training Facility and Offices
    • T5 Data Centers - Elk Grove Campus
  • Transportation
    • O'Hare International Airport, CONRAC
    • O'Hare International Airport, South Airport Traffic Control Tower (SATCT)
 

Gibson Electric

  • About Us
  • Services
  • Case Studies
  • Careers

EMCOR Group, Inc. 

  • About Us
  • Locations
  • Investor Relations
  • Corporate Social Responsibility
©2019 EMCOR Group Inc.

Privacy Policy | Sitemap

NYSE: EME